South Parade, roadworks in Rochdale from 25 April 2025

Area
Rochdale
Expected start and finish
  • 8am–5.30pm, Friday, 25 April 2025
  • 8am–5.30pm, Monday, 28 April 2025
  • 8am–5.30pm, Tuesday, 29 April 2025
  • 8am–5.30pm, Wednesday, 30 April 2025
Reason
To install a new gas connection for 8 South Parade.
Restriction and location

South Parade:

  • Part of the taxi rank will be suspended. The suspension will begin 19 metres west of the junction with Drake Street to a point 35 metres away in a westerly direction.
  • Vehicles won't be allowed to wait at any time during the closure. This restriction will begin 19 metres west of the junction with Drake Street to a point 35 metres away in a westerly direction.
Organised by
Rochdale Borough Council